11-(1)

Executive operations of electricity and instrumentation of revamping units of Imam Khomeini Oil Refinery- Shazand





* Executive operations of this project includes: surveying, drilling, demolishing, concrete, installation of conduit, tray and ladder of cable, hook up and air supply like: Desalter , Blower.
* Number of equipment of Electrical section: 370 units of types of panels, JB, transformer, socket, stand 2.4 m to 15 m, LCS, joint and earthing system.
* Number of equipment of Instrument section: 210 units of types of panels, JB, Gauge, Transmitter, Valve.
* Volume of drilling carried out: 4500 cub. m, electric and earth cabling: 19200 m , instrumentation cabling: 8400 m.
* Client: Consortium of Companies: Oil Design and Construction (ODCC), SAZEH, SEI
* Year of execution: 2009 and 2010.


Executive operations of electricity, instrumentation and civil works in Phase 1 of Unit 20 of Imam Khomeini Oil Refinery- Shazand.




* Executive operations of this project includes: surveying, drilling, demolishing, concrete, installation of conduit, tray and ladder of cable, hook up and air supply, test and pre-commissioning of transformers and panels inside the sub-station and free run, number of 24 electromotors.
* Number of equipment of electrical section: 850 units of types of panels, JB, switchgear, transformers, UPS system, socket, stands 2.4 m to 5 m , LCS, joint and earthing system.
* Number of equipment of Instrument section: 385 units of types of panels, JB, Gauge, Transmitter, Valve.
* Volume of drilling carried out: 35000 cub. m, concrete work: 1300 cub. m, electric and earth cabling: 124000 m, Instrumentation cabling: 104000 m.
* Installation of internal equipment of sub-station (SS-30) includes: conduit work, tray work, cabling, earhting, installation of types of panels, transformers and UPS system together with all tests and operations required for the commissioning of sub-stations.
* Client: Consortium of Companies: Oil Design and Construction (ODCC), SAZEH, SEI
* Year of execution: 2010 and 2011.

Executive operations of electricity and instrumentation of HDPE project of Arak Petrochemical Research and Technology Company.







* Client: Arak Petrochemical Research and Technology Co.
* Year of execution: 2012
Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery

Phase 1 of Imam Khomeini Oil Refinery